Streamlining permitting for new photovoltaic installations can have big effects on costs
LBNL just released a report titled “The Impact of City-level Permitting Processes on Residential Photovoltaic Installation Prices and Development Times: An Empirical Analysis of Solar Systems in California Cities.” Here’s summary text from an email I just received from one of the study’s coauthors (Ryan Wiser):
Business process or “soft” costs account for well over 50% of the installed price of residential photovoltaic (PV) systems in the United States, so understanding these costs is crucial for identifying PV cost-reduction opportunities. Among these costs are those imposed by city-level permitting processes, which may add both expense and time to the residential PV development process.
Building on previous research, this study evaluates the effect of city-level permitting processes on the installed price of residential PV systems and on the time required to develop and install those systems. The study uses a unique data-set from the U.S. Department of Energy’s Rooftop Solar Challenge Program, which includes city-level permitting process “scores,” plus data from the California Solar Initiative and the U.S. Census. Using multivariate statistical analysis, the study quantifies the price and development-time effects of city-level permitting processes on more than 3,000 PV installations across 44 California cities in 2011.
Results indicate that city-level permitting processes have a substantial effect on average PV installation prices and project development times.
- –PV Installation Prices: The results suggest that cities within our sample with the most favorable permitting practices have average residential PV prices that are $0.27–$0.77/W lower (4%–12% of median PV prices in California) than cities with the most onerous permitting practices.
- –PV Development Times: Though the findings for development times are less robust, results suggest that cities within our sample with the most streamlined permitting practices have average PV development times that are around 24 days shorter (25% of the median development time) than cities with the most onerous permitting practices.
Overall, these findings illustrate the potential price and development-time benefits of streamlining local permitting procedures for PV systems.
The study’s final report can be found at:
http://emp.lbl.gov/sites/all/files/lbnl-6140e.pdf
A PowerPoint briefing that summarizes the report can be found at:
http://emp.lbl.gov/sites/all/files/lbnl-6140e-ppt_0.pdf
The bottom line is that permitting matters, and that cities who pay attention to fixing these processes can have a large impact on the costs their residents pay for installing solar photovoltaics. For those cities who want to go “whole hog”, they can copy the efforts of Lancaster, CA, which are about as aggressive as any I’ve seen.